OUR SERVICES
Contact Us
+971 54 319 0845
Phone Number
info@samaaltariq.org
Email Address
Sapphire Tower, UAE
Office Address
Water Proofing
In Dubai, the construction of most roofs is done using reinforced cement concrete. Structures made of concrete show signs of degradation of the matrix and corrosion of steel bars with age. Therefore, be it residential or commercial space, terrace waterproofing is of the utmost importance when it comes to keeping the whole structure leakproof. Let us understand why. Roofs of your establishments are the first place to face the brunt of changing weather and climates. Over time, they develop cracks in them and then start the problem of water leakage. Through these cracks, water gradually creeps in and spread out inside the structure, ruining the aesthetic appeal and weakening the structural strength. To protect your space from the perils of water leakage, concrete roof waterproofing is a must. Surface preparation: The surface must be clean, dry, and free from laitance, dust, sand, oil, and other contaminations. Touch for larger blow holes or cracks will be carried out prior to the application of the first full coat of the Jotun Roofguard Base Coat Application: The application of the first full coat of the Jotun Roofguard will be done after the preparation of the surface once it will be dry. The base Coat creates a foundation for the coating to absorb the movement. Fiberglass Mesh Installation: Fiberglass Mesh has excellent properties including water resistance, flexibility, softness, and resistance to aging. Fiberglass Mesh will be embedded into the first coat of Roofguard while still wet to achieve the best results and it helps the additional protection to the surface. Intermediate Coat Application: A second full coat of Jotun Roofguard will be applied on top of the Fiberglass Mesh to strengthen the coating system and add additional protection to the waterproofing. Topcoat Application: As the name suggests, it’s a top-level of the system. It comes with many properties like Anti Abrasive, UV stable, Anti-Static, and Solar Reflective. Postwork and Restoration: After the application of the Roofguard Waterproofing, the restoration process will be done once the surface will be dry. All the waste and other garbage materials will be disposed of as per the Dubai Municipality requirements.